Redwood Creek overlook rehabilitation project: unit 88-4
Johnson LE. 1989. Redwood Creek overlook rehabilitation project: unit 88-4
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The work site was an unstable cable-yard log landing on Bald Hills Road in an area planned for future visitor facilities. Following a brief outline of site characteristics and history, the report summarizes the rehabilitation work. The report includes tables of costs, and a list of photopoints used. Background information on file for most sites includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Johnson, Louise
- Date of Issue
- 1989-12
- Units
- REDW
- Keywords
- Management, Redwood Creek Basin Redwood National Park CA, Restoration, Rivers & Streams