Report on the rehabilitation of site 80-6
Teti P. 1981. Report on the rehabilitation of site 80-6
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. This report on work at the nose of Bridge Creek describes the treatments site-by-site, with cost summaries of various techniques. The conclusions discuss cost-effectiveness and use of this kind of analysis. Includes sketch maps: a folded site map showing major features, and maps of geomorphic features. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Teti, Patrick
- Date of Issue
- 1981-06
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds