A section of the C-20 road & rock quarry, watershed rehabilitation project summary report: unit 88-10
Short DA. 1989. A section of the C-20 road & rock quarry, watershed rehabilitation project summary report: unit 88-10
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains brief information on the 88-10 site (the C-20 Road in the Miller Creek drainage), and discusses the erosion control work. Work at this site was mainly outsloping the road and restructuring an abandoned rock quarry. Maps show location and treatment, and tables summarize costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Short, Darcia
- Date of Issue
- 1989-01
- Units
- REDW
- Keywords
- C-20 Road Redwood National Park CA, Management, Miller Creek Redwood National Park CA, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control), Watersheds