Summary of erosion control rehabilitation work, unit 81-2: Lower Slide Creek
Spreiter TA and Johnson LE. 1982. Summary of erosion control rehabilitation work, unit 81-2: Lower Slide Creek
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. For this work at Lower Slide Creek, the summary describes the original road network and land use/timber harvest history, along with erosion features and sediment sources (with maps). Most of the report is details of the heavy equipment and labor-intensive site work, with evaluations. Costs are summarized in tables. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Spreiter, Terry; Johnson, Louise
- Date of Issue
- 1982-05
- Units
- REDW
- Keywords
- Erosion, K&K Road Redwood National Park CA, Land Use, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Sedimentation, Slide Creek Redwood National Park CA, Watersheds