Summary of erosion-control rehabilitation work, unit 81-5: Y-2 Road IFB contract
Wosika EP, Vann DW, Sandecki M. 1982. Summary of erosion-control rehabilitation work, unit 81-5: Y-2 Road IFB contract
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The first section describes the site and logging history, and the erosion features at the Y-2 haul road. The second half gives details of the heavy equipment rehabilitation work. Appendices are a photopoint map and cost analysis sheets. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Wosika, Edward; Vann, Daniel; Sandecki, Michael
- Date of Issue
- 1982-03
- Units
- REDW
- Keywords
- Devils Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Watersheds