Summary of erosion control work, unit 82-1: C-3O road and slope, Emerald Creek basin
Spreiter TA and Johnson LE. 1983. Summary of erosion control work, unit 82-1: C-3O road and slope, Emerald Creek basin
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains site and erosion descriptions, and summaries of both heavy equipment and labor intensive work. Report also includes 4 maps and tables of erosion features, erosion control work, and costs. Appendices are an inventory of skid trail crossings, culvert capacities, heavy equipment costs, and straw distribution. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Spreiter, Terry; Johnson, Louise
- Date of Issue
- 1983-02
- Units
- REDW
- Keywords
- C-30 Road Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control), Watersheds, W-Line Road Redwood National Park CA