Summary of erosion control work, unit 82-3: Devils Creek basin
Sandecki M and Vann DW. 1983. Summary of erosion control work, unit 82-3: Devils Creek basin
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report begins by describing the unit at Devils Creek, its logging history, and erosional features (with maps). Most of the report is details of the heavy equipment work, with a short section on labor-intensive site work. Tables summarize costs and equipment use. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Sandecki, Michael; Vann, Daniel
- Date of Issue
- 1983-05
- Units
- REDW
- Keywords
- Devils Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds