Summary of erosion control work, unit 83-5: W-Line/K&K slope

Johnson LE. 1983. Summary of erosion control work, unit 83-5: W-Line/K&K slope

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report begins by describing the unit near Elk Camp Prairie, its logging history, and erosion features (with maps). Most of the report is details of the heavy equipment and labor-intensive site work, with evaluations. (The major work at this site was done by heavy equipment, with some secondary treatment by hand labor.) Tables summarize the erosion control work, heavy equipment use and costs. A list of photopoints used, with description of locations, is Table 16. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Johnson, Louise
Date of Issue
1983-11
Units
REDW
Keywords
Erosion, K&K Road Redwood National Park CA, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds, W-Line Road Redwood National Park CA

Full text (PDF)

Collections

Browse the catalog