Summary of erosion control work, unit 84-2: M-7-5-4/M-7-5-5
Sandecki M. 1984. Summary of erosion control work, unit 84-2: M-7-5-4/M-7-5-5
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It describes the setting and rehabilitation of two former logging haul roads on Bridge Ridge (with maps). Another map shows the erosion control treatments, and tables provide information on heavy equipment use and project costs. Appendices are the contract specifications and the contract bid schedule. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Sandecki, Michael
- Date of Issue
- 1984-12
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control), Watersheds