Summary of rehabilitation work, unit 84-6: M-7-5 slopes

Utley KW. 1984. Summary of rehabilitation work, unit 84-6: M-7-5 slopes

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The brief report begins by describing the unit, just south of the confluence of Bridge Creek with Redwood Creek. A map shows sites of erosion control projects along Redwood Creek (1977-1983). Work at the 84-6 site consisted of excavating 62 skid trail crossings and building water bars on any skid trails used for access. Tables summarize the work and costs. The final map shows slope crossings. Background information on file for most sites includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Utley, Kenneth
Date of Issue
1984-11
Units
REDW
Keywords
Bridge Creek Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Watersheds

Full text (PDF)

Collections

Browse the catalog