Summary of rehabilitation work, unit 84-8: M-7-5-1 road
Utley KW. 1984. Summary of rehabilitation work, unit 84-8: M-7-5-1 road
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The short report describes restorative work on the 84-8 Bridge Creek site, with two maps (general location and site). It includes a table of heavy equipment use and costs. The D-8 crawler tractor is the only equipment used, and the author suggests that the method may be useful in other similar projects. Background information on file for most sites includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Utley, Kenneth
- Date of Issue
- 1984-10
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Rivers & Streams, Watersheds