Summary report: C-40, C-50, C-70, and Lower C-Line rehabilitation unit, 85-4
Vann DW. 1986. Summary report: C-40, C-50, C-70, and Lower C-Line rehabilitation unit, 85-4
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site (in the Miller and Emerald creek drainages), and a chronological summary of erosion features. The report describes the erosion control rehabilitation work, with an evaluation of the heavy equipment phase. Labor intensive work consisted of secondary treatments (particularly spreading straw mulch). Tables show costs and equipment specifications. Two hand-colored maps show treatment areas and types. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Vann, Daniel
- Date of Issue
- 1986-02
- Units
- REDW
- Keywords
- Emerald Creek Redwood National Park CA, Management, Miller Creek Redwood National Park CA, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds