Summary report, erosion control rehabilitation of the M-6-1 Road, Bridge Creek: unit 86-4
Bundros GJ. 1989. Summary report, erosion control rehabilitation of the M-6-1 Road, Bridge Creek: unit 86-4
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site (in the Bridge Creek watershed), the logging history (with a map), and erosion history. Along with the description of the erosion control work, it contains a map showing the treatments, and tables summarizing the work and costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory
- Date of Issue
- 1989-01
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Stabilization (Erosion Control), Watersheds