Summary report: erosion control work performed on the Fortyfour Creek rehabilitation unit, 84-5

Bundros GJ and Burns D. 1984. Summary report: erosion control work performed on the Fortyfour Creek rehabilitation unit, 84-5

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin. It contains a description of the site along Fortyfour Creek and of some interesting geomorphic features. Seven miles of former logging road were removed from this unit. The report describes the erosion control rehabilitation work, and includes tables of costs, and of volumes and other information regarding excavated haul road crossings. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Bundros, Gregory; Burns, David
Date of Issue
1984-11
Units
REDW
Keywords
Fortyfour Creek Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control), Watersheds

Full text (PDF)

Collections

Browse the catalog