Summary report, erosion control work performed on the M-6 road network, Bridge Creek: Unit 87-3
Bundros GJ. 1989. Summary report, erosion control work performed on the M-6 road network, Bridge Creek: Unit 87-3
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the 87-3 site in the Bridge Creek watershed. The author describes the history of logging and erosion on the site, along with the erosion control treatment (maps). Most of the work was done with heavy equipment, and tables summarize work and costs. The summary notes that over $27,000 could have been saved by working with rental equipment instead of a fixed-price contract. The appendix contains an abstract of bids. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory
- Date of Issue
- 1989-01
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control), Watersheds