Summary report, lower D-Line road and slope, rehabilitation unit 82-5

Burns WD and Routon PE. 1983. Summary report, lower D-Line road and slope, rehabilitation unit 82-5

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site between Bald Hills Road and Redwood Creek, and a chronological summary of erosion features (with maps). The report describes the erosion control rehabilitation work, with evaluations of the heavy equipment and labor intensive phases. It includes an aerial photograph of 1972, and tables of costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Burns, W; Routon, Paul
Date of Issue
1983-02
Units
REDW
Keywords
D-Line Road Redwood National Park CA, Erosion, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds

Full text (PDF)

Collections

Browse the catalog