Summary report of work performed on rehabilitation unit 83-3: Bridge Creek
Bundros GJ and Burns D. 1984. Summary report of work performed on rehabilitation unit 83-3: Bridge Creek
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report begins by describing the unit in the Bridge Creek watershed on the west side of Redwood Creek, its logging history, and erosion features (with maps). Most of the report is details of the heavy equipment work, with a short section on labor-intensive site work. Tables summarize costs and equipment use. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory; Burns, David
- Date of Issue
- 1984-11
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds