Summary report, watershed restoration unit 97-1: C-Line south
Smith B. 1999. Summary report, watershed restoration unit 97-1: C-Line south
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. Background information on file for most sites in this series includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Smith, Becca
- Date of Issue
- 1999-02
- Units
- REDW
- Keywords
- C-Line Road Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Rehabilitation, Restoration, Watersheds