Summary report, rehabilitation unit 82-2: C-20 road & slope and C-Line landing 2
Utley KW, Burns WD, Routon PE. 1983. Summary report, rehabilitation unit 82-2: C-20 road & slope and C-Line landing 2
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report begins by describing the unit, its logging history, and geomorphology/erosion features. Most of the report is details of the heavy equipment and labor-intensive site work. Relatively little labor-intensive work was done at this site. Costs are summarized in tables. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Utley, Kenneth; Burns, W; Routon, Paul
- Date of Issue
- 1983-02
- Units
- REDW
- Keywords
- C-Line Road Redwood National Park CA, Geomorphology, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Watersheds