Summary report, rehabilitation unit 86-1: M-7/M-7-5 roads, Bridge Creek basin

Kenning M. 1987. Summary report, rehabilitation unit 86-1: M-7/M-7-5 roads, Bridge Creek basin

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site (in the Bridge Creek drainage), land use history, and erosion history (with logging history and erosion-control treatment maps). The report describes the erosion control work, and tables give summaries of the work and costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Kenning, Michael
Date of Issue
1987-12
Units
REDW
Keywords
Bridge Creek Redwood National Park CA, Erosion, Land Use, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Stabilization (Erosion Control), Watersheds

Full text (PDF)

Collections

Browse the catalog