Summary report, rehabilitation work performed on the M-6 hillslopes, Bridge Creek: Unit 87-4

Bundros GJ. 1989. Summary report, rehabilitation work performed on the M-6 hillslopes, Bridge Creek: Unit 87-4

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains maps of the 87-4 site in the Bridge Creek watershed, including Map D: rehabilitation treatments. Work consisted of excavating 11 skid trail crossings. Tables summarize heavy equipment/labor intensive work and costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Bundros, Gregory
Date of Issue
1989-02
Units
REDW
Keywords
Bridge Creek Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Watersheds

Full text (PDF)

Collections

Browse the catalog