Summary report, watershed rehabilitation unit 90-3: M-7, M-5, G-4

Short DA. 1994. Summary report, watershed rehabilitation unit 90-3: M-7, M-5, G-4

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. Work on this unit in the Bridge Creek basin included removal of a bridge and recontouring with heavy equipment to remove part of a former logging road. Tables summarize costs, and four maps show location, topography, logging history, and erosion control details. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Unpublished Report
Authors
Short, Darcia
Date of Issue
1994-10
Units
REDW
Keywords
Bridges, K&K Road Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Watersheds

Full text (PDF)

Collections

Browse the catalog