Summary report, watershed rehabilitation units 95-1 and 95-2: Ah Pah Road complex

Smith B. 1997. Summary report, watershed rehabilitation units 95-1 and 95-2: Ah Pah Road complex

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The beginning describes the unit (worked simultaneously in two parts), its logging history (with map), geology, and effects of wildlife concerns on the work schedule. The report gives details of the rehabilitation work, with a treatment map, tables of costs and production rates, and a brief report from subsequent monitoring of the sites. The appendix contains 15 original before-and-after color prints (from identified photopoints). Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Smith, Becca
Date of Issue
1997-06
Units
REDW
Keywords
Ah Pah Road Redwood National Park CA, Animals, Geology, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Watersheds

Full text (PDF)

Collections

Browse the catalog