Upper Boyes Creek roads rehabilitation project: unit 89-1
Bundros GJ. 1990. Upper Boyes Creek roads rehabilitation project: unit 89-1
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains brief descriptions (geology/geomorphology, soils, land use, erosion features) of the site in the upper Boyes Creek drainage, where roads would soon by isolated by the Highway 101 Bypass. Maps show logging history and topography. Includes a work summary, tables of costs, and an evaluation of the heavy equipment used. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory
- Date of Issue
- 1990-03-25
- Units
- REDW
- Keywords
- Boyes Creek Redwood National Park CA, Erosion, Geology, Geomorphology, Land Use, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Soil Types, Watersheds