Watershed rehabilitation report for South of Copper Creek (Big Tree), site 80-1 [draft]
Utley KW. 1981. Watershed rehabilitation report for South of Copper Creek (Big Tree), site 80-1 [draft]
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report describes conditions at the Big Tree site (or 1920 Road slope) south of Copper Creek, outlines the erosion control work and documentation, and evaluates the cost-effectiveness of the work. Attachments include information on heavy equipment work and labor intensive work. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Utley, Kenneth
- Date of Issue
- 1981-03-19
- Units
- REDW
- Keywords
- Big Tree Redwood National Park CA, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Stabilization (Erosion Control), Watersheds