Biological Activities Related to Desert Tortoise (Gopherus agassizii) within the Mead-Phoenix 500KV Project Corridor: A Summary Report for the Period March, 1993-December, 1995; Mead-Phoenix 500 KV Project

Ecoplan Associates, Inc.. 1996. Biological Activities Related to Desert Tortoise (Gopherus agassizii) within the Mead-Phoenix 500KV Project Corridor: A Summary Report for the Period March, 1993-December, 1995; Mead-Phoenix 500 KV Project. US Department of Energy. Golden, CO

A construction survey of the Mead-Phoenix 500kV transmission line project from near Phoenix, AZ to the substation in Clark County, Nevada, between March 1993, and December 1995 and how the project affected the desert tortoise (Gopherus agassizii). A small part of the project runs throught the Lake Mead National Recreation Area. There were three known incidental "takes" reported in the recreation area that were consistent with being crushed by a motor vehicle. Gates were constructed on the access roads in the park to reduce the potential of a desert tortoise "take".

Type
Published Report
Authors
Ecoplan Associates, Inc.
Date of Issue
1996
Publisher
US Department of Energy
Units
LAKE
Keywords
Absence (Biodiversity), Clark County NV, Colorado Plateau, Construction, Gopherus agassizii (Desert Tortoise), Mead-Phoenix transmission line, Mortality, Presence (Biodiversity), take, Taxa Links To References, Threatened & Endangered Species, Transmission Lines

Collections

Browse the catalog