Environmental Mitigation and the Upper Yazoo Projects

Dardeau EA and Fischenich JC. 1995. Environmental Mitigation and the Upper Yazoo Projects. Environmental Geology. 25

The US Army Engineer District, Vicksburg (CELMK), evaluated an array of flood control alternatives, which included up to 167 water control structures, 52 confined disposal facilities, and 47 borrow pits as part of a major flood control effort known as the Upper Yazoo Projects (UYP). Many ofthese project features are capable of ponding water and thus can be managed to mitigate for aquatic, terrestrial, waterfowl, and wetland resource losses expected to occur as a result of the UYP. The benefits to be derived will depend upon the land uses and management ofthe ponded areas. The US Army Engineer Waterways Experiment Station developed procedures to quantify the cost and habitat benefits of the many managementoptions for these sites. The mitigation strategy was derived by optimizing various combinations of land acquisition, reforestation, land-use change, and site hydrology so that the least-cost mitigation plan could be selected.

Type
Journal Article
Authors
Dardeau, E.; Fischenich, J.
Units
VICK
Keywords
Environmental Impacts, Flood Control, Mississippi, VICK, Vicksburg National Military Park

Series

Browse the catalog