Echols_2006_BNPLetterA3Workover
Echols DL. 2006. To: Guerrero D. Re: Echols_2006_BNPLetterA3Workover
On November 3, the National Park Service received notification that BNP proposed to re-enter the A3 well location with the objective of deepening the well and placing the well in production. It is our understanding that the well was conditioned several weeks ago in preparation for the Parker Rig currently drilling Kindee's ST 212 #1 well. However, there appears to be some confusion regarding what is being proposed, what has been accomplished, and what is covered by the existing compliance for the continued operations of the Dunn-McCampbell A3 well. We have been notified by the Railroad Commission of Texas (RRC) that the A3 well may have been improperly plugged and if so, does not meet the plugging requirements outlined in the Statewide Ru1esfor Oil, Gas, and Geothermal Operations. We have discussed this with the RRC and based on these conversations, examination of the logs completed by the workover rig, and examination of the A3 site location, it appears that the A3 well has been plugged. We understand that conditions can change during a workover operation especially in light of a well drilled several decades ago. If conditions changed trom the original plan, the NPS shou1dhave been notified that conditions were different or that changes were needed prior to completion of the workover operation. We did not receive notification and hence the confusion about what is being planned compared to what was proposed. As you know, the approval to operate a well with the park is conditioned upon the adherence to state and federal regulations and violations of those regu1ationscould result in a suspension of an operation. We understand that the RRC will require BNP to submit an updated plugging plan for their approval and address their concerns regarding the plugging that was accomplished several weeks ago. We request a copy of the updated plugging plan that is being submitted to the RRC. With respect to drilling, the current approved plan for A3 only allows for the re-entry of the existing well bore for the purposes of extending or side-tracking the well to a new bottom hole location. Anything beyond this including drilling a new hole in the ground outside of the existing A3 well bore, which would constitute a new well, is not covered by the existing plan and would require a new or ammended plan and additional compliance. Until this confusion can be clarified, we are unable to continue the compliance documentation necessary to allow re-entry into A3.
- Type
- Administrative
- Authors
- Echols, Darrell
- Date of Issue
- 2006-11-07
- Units
- PAIS
- Keywords
- A3, A-3, BNP, Email, improper, improperly, letter, plugged, workover