Salt Marsh Community Rod-Surface Elevation Table (RSET) Installation
Asper JR and Curtis AC. 2012. Salt Marsh Community Rod-Surface Elevation Table (RSET) Installation
The following Standard Operating Procedure (SOP) outlines the procedure involved in installing a Rod Surface Elevation Table (RSET). The RSET method provides a non-destructive process that precisely measures changes in ground surface elevation over time relative to a fixed subsurface datum.
- Type
- Standard Operating Procedure
- Authors
- Asper, Jennifer; Curtis, Anthony
- Date of Issue
- 2012-02-16
- Units
- SECN
- Keywords
- Safety, Saltmarsh Elevation Procedures