Moose Monitoring Protocol for the Arctic Inventory and Monitoring Network Standard Operating Procedure (SOP) #1 Survey Preparation and Timing

Sorum M and Joly K. 2018. Moose Monitoring Protocol for the Arctic Inventory and Monitoring Network Standard Operating Procedure (SOP) #1 Survey Preparation and Timing. National Park Service.

This SOP describes logistical considerations to prepare for a moose survey, and some guidance on survey timing.

Type
Standard Operating Procedure
Authors
Sorum, Mathew; Joly, Kyle
Date of Issue
2018-08
Publisher
National Park Service.

Full text (PDF)

Browse the catalog