Moose Monitoring Protocol for the Arctic Inventory and Monitoring Network Standard Operating Procedure (SOP) #1 Survey Preparation and Timing
Sorum M and Joly K. 2018. Moose Monitoring Protocol for the Arctic Inventory and Monitoring Network Standard Operating Procedure (SOP) #1 Survey Preparation and Timing. National Park Service.
This SOP describes logistical considerations to prepare for a moose survey, and some guidance on survey timing.
- Type
- Standard Operating Procedure
- Authors
- Sorum, Mathew; Joly, Kyle
- Date of Issue
- 2018-08
- Publisher
- National Park Service.