GLBA wilderness waiver for freshwater quality installation
Boudreau S. 2013. GLBA wilderness waiver for freshwater quality installation
From April 15 through October 31 of each year for which a valid Scientific Research and Collecting Permit is in effect. in the manner and for the specific purposes (and at the location) described above, the project leader is authorized to temporarily deploy a water quality sonde within designated wilderness. Between October 31 and April 15. all components of the installation will be completely removed from designated wilderness (no storage onsite). Moreover, the installation itself will be deployed in such a way to have as little impact to wilderness resources and values (including visibility) as possible.
- Type
- Administrative
- Authors
- Boudreau, Susan
- Date of Issue
- 2013-04-05
- Units
- GLBA , SEAN
- Keywords
- Conductivity, Dissolved Oxygen, NTU, permit, pH, sonde, Temperature, Turbidity, Water Quality, wilderness waiver
- Subjects
- Ecological Framework: Water | Water Quality | Water Chemistry