GLBA wilderness waiver for freshwater quality installation

Boudreau S. 2013. GLBA wilderness waiver for freshwater quality installation

From April 15 through October 31 of each year for which a valid Scientific Research and Collecting Permit is in effect. in the manner and for the specific purposes (and at the location) described above, the project leader is authorized to temporarily deploy a water quality sonde within designated wilderness. Between October 31 and April 15. all components of the installation will be completely removed from designated wilderness (no storage onsite). Moreover, the installation itself will be deployed in such a way to have as little impact to wilderness resources and values (including visibility) as possible.

Type
Administrative
Authors
Boudreau, Susan
Date of Issue
2013-04-05
Units
GLBA , SEAN
Keywords
Conductivity, Dissolved Oxygen, NTU, permit, pH, sonde, Temperature, Turbidity, Water Quality, wilderness waiver
Subjects
Ecological Framework: Water | Water Quality | Water Chemistry

Full text (PDF)

Browse the catalog