Report of Lead Paint Survey Services Marmion Row Building 1A East Porch

Law Engineering and Environmental Services, inc.. 2000. Report of Lead Paint Survey Services Marmion Row Building 1A East Porch

LAW, responding to an NPS Scope of Work Proposal of May 9, 2000, conducted a survey for the presence of lead-based paint and lead in soil at Marmion Row Building #1A, Harper House East Porch. LAW analyzed 114 painted porch surfaces, collected six lead-dust wipe samples off the porch, and collected one composite soil samples along the "drip Line" from the east side of the porch. LAW recommended specific actions dealing with areas considered to be painted with lead-based paint or containing ACM.

Type
Unpublished Report
Authors
Law Engineering and Environmental Services, inc.
Date of Issue
2000-06-02
Units
HAFE
Keywords
HFR 00747, HFR 747, HFR00747, HFR-00747, HFR747, HFR-747

Full text (PDF)

Browse the catalog