Final Report: Renovation of Ranger Dorm No. 2 and Administrative Building No. 1, Crater Lake National Park
Zaik/Miller/DiBendetto Architects. 1984. Final Report: Renovation of Ranger Dorm No. 2 and Administrative Building No. 1, Crater Lake National Park. Historic Structure Report. U.S. Department of the Interior, National Park Service. Portland, Oregon
This final report contains the plans for the renovation of Ranger Dorm #2 and the Administrative Building #1 at Crater Lake National Park. The report was prepared under contract for the National Park Service by the design team, based on site visits, interviews, and documentation of the buildings since their construction in the 1930s. The purpose of the report is to present the results of studies about the systems located in the two buildings with recommended plans for improvements and cost estimates.
- Type
- Published Report
- Authors
- Zaik/Miller/DiBendetto Architects
- Date of Issue
- 1984-03-30
- Publisher
- U.S. Department of the Interior, National Park Service
- Units
- CRLA , PWR
- Keywords
- administration building, construction material, dormitory, electrical systems, landscape, material specification, mechanical systems, park housing, rustic style, snow tunnel, Visitor Information Center
- Subjects
- CRIS-HS: 012011: Administration Building, Munson Valley , CRIS-HS: 012012: Ranger Dormitory, Munson Valley