Standard Operating Procedure #4: Ecological Site Assessment, Version 20080808

Swan M and DeCoster J. 2008. Standard Operating Procedure #4: Ecological Site Assessment, Version 20080808. Southern Colorado Plateau Network

This standard operating procedure (SOP) gives step-by-step instructions for describing physical and biotic characteristics of potential field sites for long-term ecological monitoring. These data are generally collected on a one-time basis, prior to plot establishment, but may be collected at infrequent intervals thereafter to determine if aspects of this assessment have changed over time. All or a portion of this SOP may be conducted on a visit prior to plot estab- lishment. Equipment needs for this procedure are listed in SOP #1, Table 1-1.

Type
Standard Operating Procedure
Authors
Swan, Megan; DeCoster, James
Date of Issue
2008-08-08
Publisher
Southern Colorado Plateau Network
Units
AZRU , BAND , CACH , CHCU , ELMA , ELMO , GLCA , GRCA , HUTR , MEVE , NAVA , PEFO , PETR , RABR , SAPU , SCPN , SUCR , WACA , WUPA , YUHO
Keywords
field site assessment, Monitoring, site selection, soil collection, upland vegetation
Subjects
Ecological Framework: Biological Integrity | Focal Species or Communities | Grassland/Herbaceous Communities , Ecological Framework: Biological Integrity | Focal Species or Communities | Shrubland Communities , Ecological Framework: Biological Integrity | Focal Species or Communities | Forest/Woodland Communities

Other versions

Collections

Browse the catalog