Water Quality Control Division Copper TMDL Study

Theel CG. Water Quality Control Division Copper TMDL Study. Research Permit and Reporting System

This Copper TMDL study was completed in June 2020. The Water Quality Control Division collected water quality data to inform a Total Maximum Daily Load (TMDL) for dissolved copper. The study also collected data parameters that may be used to develop a Biotic Ligand Model (BLM) for use in potentially developing a site-specific standard for copper for waterbody segment COSPBT01. The data has not been analyzed by the Division's TMDL Program, thus there are no findings to share yet.

Type
Unpublished Report
Authors
Theel, Christopher
Publisher
Research Permit and Reporting System
Units
ROMO

Browse the catalog