Standard Operating Procedure CI01: Preparation for Fieldwork—Version 1.1
South Florida/Caribbean Network. 2022. Standard Operating Procedure CI01: Preparation for Fieldwork—Version 1.1. National Park Service
Before each scheduled field event, proper preparation is essential to collecting good data. This SOP provides a list of the items that need to be taken care of before doing fieldwork and includes detailed steps for uploading site/infestation waypoints to a GPS unit, uploading a FileMaker Pro database to an iPad, and uploading an offline ArcGIS Online map to an iPad.
- Type
- Standard Operating Procedure
- Authors
- South Florida/Caribbean Network
- Date of Issue
- 2022-03
- Publisher
- National Park Service
- Units
- BICY , BISC , EVER , SFCN
- Keywords
- Corridors, Corridors of Invasiveness, Corridors of Invasiveness SOP, Corridors of Invasiveness Standard Operating Procedures, Invasive Exotic Plants, Invasive Exotic Plants Protocol, Invasive Exotic Plants SOP, SOP, Standard Operating Procedure