Standard Operating Procedure CI01: Preparation for Fieldwork—Version 1.1

South Florida/Caribbean Network. 2022. Standard Operating Procedure CI01: Preparation for Fieldwork—Version 1.1. National Park Service

Before each scheduled field event, proper preparation is essential to collecting good data. This SOP provides a list of the items that need to be taken care of before doing fieldwork and includes detailed steps for uploading site/infestation waypoints to a GPS unit, uploading a FileMaker Pro database to an iPad, and uploading an offline ArcGIS Online map to an iPad.

Type
Standard Operating Procedure
Authors
South Florida/Caribbean Network
Date of Issue
2022-03
Publisher
National Park Service
Units
BICY , BISC , EVER , SFCN
Keywords
Corridors, Corridors of Invasiveness, Corridors of Invasiveness SOP, Corridors of Invasiveness Standard Operating Procedures, Invasive Exotic Plants, Invasive Exotic Plants Protocol, Invasive Exotic Plants SOP, SOP, Standard Operating Procedure

Browse the catalog