Report from the APCC 1974

Carr HE. 1974. Report from the APCC 1974. National Park Service

After the Massachusetts Commissioner of Natural Resources issued his December 17, 1973, Order of Conditions (file 77-2) governing the reconstruction of the dike at Herring River, APCC became concerned because the then Selectmen and the Massachusetts Department of Public Woks gave no indication of any intent to comply. Faithful compliance would require the ascertaining of essential baseline data on the part of the Selectmen and a modification of the valving arrangement on the part of the DPW to properly accommodate the two-way tidal flow mandated by the Order. Since no moves were made to meet either of these needs, APCC decided it would be consistent with APCC objectives to attempt to partially fill the vacuum, and decided to determine accurately: the nature of the salt water flow through and above the dike; the inside tidal range; and the nature of plant and animal life as they existed in the lower basin.

Type
Unpublished Report
Authors
Carr, H.
Date of Issue
1974-11-20
Publisher
National Park Service
Units
CACO
Keywords
APCC, CACO, Cape Cod National Seashore, Dike, Estuary, Herring River, Restoration, River, Salt Marsh, Wellfleet, Woods Hole

Full text (PDF)

Collections

Browse the catalog