Cost analysis: Bond Creek, site 79-1, heavy equipment phase
Bundros GJ. 1980. Cost analysis: Bond Creek, site 79-1, heavy equipment phase
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. Work on site 79-1 involved removal of the L-1-5 Road and work on the hillslope above. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory
- Date of Issue
- 1980-02-20
- Units
- REDW
- Keywords
- Bond Creek Redwood National Park CA, Management, Photo Points, Redwood Creek Basin Redwood National Park CA, Restoration, Slides