Cost analysis: Bridge Creek, site 79-2, heavy equipment phase

Bundros GJ. 1980. Cost analysis: Bridge Creek, site 79-2, heavy equipment phase

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. This focuses on the use of heavy equipment in restructuring the M-7-5-1 Road site in the Bridge Creek area, with tables and analysis of costs for individual parts of the project. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Bundros, Gregory
Date of Issue
1980-02-29
Units
REDW
Keywords
Bridge Creek Redwood National Park CA, Management, Photo Points, Redwood Creek Basin Redwood National Park CA, Restoration, Slides, Watersheds

Full text (PDF)

Collections

Browse the catalog