Erosion control work performed on the Bond Creek rehabilitation unit, site 82-4: summary report

Bundros GJ and Horns M. 1982. Erosion control work performed on the Bond Creek rehabilitation unit, site 82-4: summary report

This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The report begins by describing the unit at Bond Creek, its logging history, and erosion features (with maps). Most of the report is details of the heavy equipment and labor-intensive site work, with evaluations. Costs are summarized in tables. The concluding section discusses a potential conflict between erosion control work and use of some of these unstable areas for horse or foot trails. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.

Type
Published Report
Authors
Bundros, Gregory; Horns, Matthew
Date of Issue
1982-12
Units
REDW
Keywords
Bond Creek Redwood National Park CA, Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration

Full text (PDF)

Browse the catalog