Erosion control work performed on Upper Devils Creek rehabilitation unit: 85-1
Bundros GJ, Sandecki M, Burns D. 1985. Erosion control work performed on Upper Devils Creek rehabilitation unit: 85-1
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It describes the logging history and erosion features of this site at Devils Creek (with maps), along with the rehabilitation work for erosion control. Three plates show the erosion control work. Tables summarize heavy equipment and labor costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Bundros, Gregory; Sandecki, Michael; Burns, David
- Date of Issue
- 1985-12
- Units
- REDW
- Keywords
- Devils Creek Redwood National Park CA, Erosion, History, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Stabilization (Erosion Control)