Extreme Values of Discharge for Mill Creek and Options to Control Flooding from the Herring River

Nuttle WK. 1990. Extreme Values of Discharge for Mill Creek and Options to Control Flooding from the Herring River. Cape Cod National Seashore. South Wellfleet, MA

A dike across the mouth of Mill Creek is proposed as part of a plan to restore tidal circulation in the Herring River. Freshwater drainage through the dike must be maintained. This report discusses two related issues: (1) the peak Mill Creek discharge rate that must be maintained through the dike, and (2) the effectiveness of two options of providing drainage through the dike. Peak discharge is estimated based on data from nine months of hydrological monitoring. A physically based precipitation-runoff model is calibrated with the data from the monitoring program and is used to calculate extreme stream discharge. The options for providing freshwater drainage through the dike across Mill Creek are a one-way valve and a pump. Although the pump is more expensive, its performance is predictable and adequate drainage can be assured.

Type
Published Report
Authors
Nuttle, William
Date of Issue
1990-02-20
Publisher
Cape Cod National Seashore
Units
CACO
Keywords
Aquatic Sciences, diking, Flooding, Herring River, Hydrology, Management, Models

Full text (PDF)

Collections

Browse the catalog