G-6 Road watershed rehabilitation project summary report [unit 87-2]
Kenning M. 1989. G-6 Road watershed rehabilitation project summary report [unit 87-2]
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site on the west side of Redwood Creek, in the Tom McDonald Creek drainage. The author describes the history of logging and road construction at the site, along with erosion features and treatment (maps). Most of the work was done with heavy equipment, and tables summarize work and costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Kenning, Michael
- Date of Issue
- 1989-02
- Units
- REDW
- Keywords
- Erosion, Logging, Management, Redwood Creek Basin Redwood National Park CA, Restoration, Tom McDonald Creek Redwood National Park CA