Glen Canyon Dam: monitoring of interim operating criteria, May through September 1992

Bureau of Reclamation. 1992. Glen Canyon Dam: monitoring of interim operating criteria, May through September 1992. United States Bureau of Reclamation

Interim flows were intended to protect resources downriver while still meeting basic water and power needs during the preparation of an environmental impact statement and final operating criteria for Glen Canyon Dam. The monitoring program evaluates critical resources and ecosystem processes relative to the interim flows to determine natural changes in the ecosystem, changes resulting from the interim flows, and effects on power generation. There is a brief summary of the different types of research, and of the responses of sediment, endangered species and other aspects to the interim flows to that point. (Three attachments.) The report is accompanied by a letter from the chief of Resource Management, Glen Canyon National Recreation Area, giving details of specific research to be done in October 1989 during a brief steady 5000 cfs flow.

Type
Published Report
Authors
Bureau of Reclamation
Date of Issue
1992
Publisher
United States Bureau of Reclamation
Units
GLCA , GRCA , WRD
Keywords
Aquatic, Beaches, Clemson, Colorado River, Dam Operation, Dams, Discharge, Ecosystems, Flow (Streamflow), Glen Canyon Dam (AZ), Glen Canyon Environmental Studies (GCES), Impacts, Monitoring, Natural Resources, NPSRecord, Preservation, Recreation, Riparian Zone, Sediment, Threatened & Endangered Species, Wildlife

Full text (PDF)

Browse the catalog