Investigations of controlled Kolob Reservoir releases during September 8-17, 1993 at Zion National Park, Utah

Stevens NF and Hansen WR. 1997. Investigations of controlled Kolob Reservoir releases during September 8-17, 1993 at Zion National Park, Utah. Technical Report NPS/NRWRD/NRTR-97/108 (NPS D-114). National Park Service, Water Resources Division. Fort Collins, Colorado

This study was designed to investigate the reliability of the existing flume on Kolob Reservoir and to determine the quantity and travel time of controlled reservoir releases reaching the confluence of Kolob Creek and the North Fork of the Virgin River.

Type
Published Report
Authors
Stevens, Nancy; Hansen, William
Date of Issue
1997-01
Publisher
National Park Service, Water Resources Division
Units
WRD , ZION
Keywords
Clemson, Creeks, discharge measurement, Hydrographs, Kolob Reservoir, North Fork Virgin River, peak evaluations, reservoir releases, Sampling, traveltime equations, Water Resources, WRBIB

Full text (PDF)

Browse the catalog