Lower Boyes Creek roads, rehabilitation project: unit 89-6
Johnson LE. 1990. Lower Boyes Creek roads, rehabilitation project: unit 89-6
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of rehabilitation work on haul roads and their stream crossings, adjacent slopes, and a rock pit at the 89-6 site in the lower Boyes Creek drainage. The report includes maps (location, topography, and rehabilitation treatment) and tables of costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Johnson, Louise
- Date of Issue
- 1990-01
- Units
- REDW
- Keywords
- Boyes Creek Redwood National Park CA, Logging, Management, Map, Redwood Creek Basin Redwood National Park CA, Restoration, Roads