M-3 and M-4 roads and slope, watershed rehabilitation project: unit 87-5
Johnson LE. 1988. M-3 and M-4 roads and slope, watershed rehabilitation project: unit 87-5
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. The 87-5 unit is in the Bridge Creek drainage, on the west side of Redwood Creek. The report describes the logging history, erosion features, and the phases of erosion control work, giving details of the rehabilitation work. It includes location, topographic, and logging history maps. Tables show costs of 11 different aspects of the project. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Johnson, Louise
- Date of Issue
- 1988-01
- Units
- REDW
- Keywords
- Aerial Photographs, Bridge Creek, Devils Creek, Erosion, Erosion Control, heavy equipment, Logging, Management, Map, Maple Creek, outslope, Redwood Creek Basin, Restoration, Road Removal, Sedimentation, Soils, Stabilization, Surveys, Timber Harvest, Water Studies