The M-4-1/2 and M-5 roads and slope watershed rehabilitation project: unit 86-3
Johnson LE. 1988. The M-4-1/2 and M-5 roads and slope watershed rehabilitation project: unit 86-3
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the site (in the Bridge Creek drainage), logging history (with map), and erosion history. Most of the work on this unit was done with heavy equipment. Labor intensive work consisted of preparatory and secondary treatments (particularly spreading straw mulch). Tables summarize costs. Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Johnson, Louise
- Date of Issue
- 1988-01
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Erosion, Logging, Management, Map, Redwood Creek Basin Redwood National Park CA, Restoration