M-7 Road and Chilula Creek culvert replacement, watershed rehabilitation project summary report [unit 88-9]
Kenning M and Short DA. 1988. M-7 Road and Chilula Creek culvert replacement, watershed rehabilitation project summary report [unit 88-9]
This report is one of a large group containing details of individual projects done as part of the major rehabilitation efforts in the Redwood Creek basin, Redwood National Park, California. It contains a description of the two parts of this project in the Bridge Creek drainage. Work on unit 88-9 involved rehabilitation work on M-7 and associated roads, and replacement of a large rusted culvert at Chilula Creek. The report describes logging and erosion history (briefly) and the erosion control work, with tables of costs. In addition to location and logging history maps, the report includes a hand-colored map of erosion treatments, and a folded marked enlargement of aerial photograph RNP 78/8-26 (in the pocket). Background information on file for each site includes photopoint files (photopoint maps and description of locations for documentary photographs), color slides (the work process, before-and-after documentation), administrative files (calculations of volumes for excavation, equipment/hours/costs, daily logs, contracts, etc.), detailed geomorphic site maps (unmarked mylar base maps with overlays), and aerial photographs.
- Type
- Published Report
- Authors
- Kenning, Michael; Short, Darcia
- Date of Issue
- 1988-12
- Units
- REDW
- Keywords
- Bridge Creek Redwood National Park CA, Chilula Creek Redwood National Park CA, Erosion, Logging, Management, Map, Redwood Creek Basin Redwood National Park CA, Restoration, Roads, Stabilization (Erosion Control)