Ozone and foliar injury monitoring standard operating procedure 5: post-sampling, version 2.0
Cumberland Piedmont Network. 2020. Ozone and foliar injury monitoring standard operating procedure 5: post-sampling, version 2.0. Cumberland Piedmont Network
This standard operating procedure (SOP) describes tasks to be performed after site visits. The tasks detailed in this SOP roughly cover the period from when field personnel have returned from the field to the point of starting data management activities. This SOP also covers procedures to follow at the end of a sampling season. The crew leader must check, shortly after sampling at each park (as appropriate and outlined in this SOP) and the field season, that all post-sampling activities have been completed (e.g., tools have been properly stored, data have been pulled from GPS units, voucher specimens have been processed).
- Type
- Standard Operating Procedure
- Authors
- Cumberland Piedmont Network
- Date of Issue
- 2020
- Publisher
- Cumberland Piedmont Network
- Units
- ABLI , CARL , CHCH , COWP , CUGA , CUPN , FODO , GUCO , KIMO , LIRI , MACA , NISI , RUCA , SHIL , STRI
- Keywords
- Air Quality, Foliar Injury, Ozone, Ozone Injury, Ozone Protocols, vital sign
- Subjects
- Ecological Framework: Air and Climate | Air Quality | Ozone
See also
- Monitoring ozone and associated foliar injury at Cumberland Piedmont Network parks: Protocol narrative—version 2.0
- Ozone and foliar injury monitoring standard operating procedure 1: training of field personnel, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 2: pre-sampling, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 3: establishment and location of sampling sites, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 4: sampling, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 6: data management and quality assurance / quality control, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 7: data analysis and reporting, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 8: revising the protocol and documentation of deviations and major changes, version 2.0